Completed natural slate roof gable with new ridge tiles under a blue sky on a house in Newcastle

Roof Replacement In Newcastle

Been told you need a whole new roof and not sure whether to believe it?

Straight advice on whether your roof actually needs replacing, and a proper strip and re-cover in natural slate, fibre cement, clay or concrete tile when it does

Most of the roofs we are asked to replace in Newcastle do not need replacing, and we say so. A few slipped slates, a tired ridge and some moss is a repair, whatever the last quote said. But some roofs are genuinely finished: nails rusted through across the whole slope, felt gone to dust, concrete tiles flaking apart in your hand. When that is the case we strip it, re-batten, fit a breathable membrane and re-cover it in a material that suits the house and the street. Free inspection, honest verdict, written quote either way.

  • We tell you if a repair will do, and most of the time it will
  • New battens, breathable membrane and fixings on every re-roof
  • Natural slate, fibre cement, clay and concrete tile options priced
  • Building Control, scaffold and skips all in the written quote

Get A Free Roof Inspection

Tell us what is going on and we will ring you back to arrange a look.

No obligation. We do not pass your details to anyone else.

Signs A Roof Genuinely Needs Replacing, And Signs It Only Looks That Way

The first four are the real thing. The last two are what people get frightened into a new roof over, and both are a repair.

Nail Sickness Right Across The Slope

On the Welsh slate roofs of Jesmond, Heaton and Sandyford the slates are usually fine. It is the iron nails that have rusted through. When one slips a year it is a repair. When they are letting go in rows and you can lift a slate off with your fingers, the roof has to come off and go back on with new fixings.

Felt Perished From Eaves To Ridge

Bitumen felt from the 60s and 70s does not fail in one spot. It goes brittle everywhere at once, tears at the eaves and crumbles when touched. Patching it from inside the loft is not a thing. If the felt has gone across the whole roof, the only way to replace it is to take the covering off.

Concrete Tiles Flaking Apart

Post-war concrete interlockers on the estates around Longbenton and Newbiggin Hall are at the age where the surface delaminates. Layers lift off in frost, the tile gets thinner and more porous, and replacements no longer match. When most of a slope is doing it, you are replacing tiles faster than it makes sense to.

A Dip You Can See From The Street

Sag along a ridge or a hollow in a slope means the timber underneath has moved. Sometimes it is a rotten rafter end at the eaves, sometimes a purlin that has split. Either way the covering has to come off to get at it, and once it is off, putting old tiles back on new timber rarely adds up.

Moss, A Few Slipped Tiles: Repairable

A green roof looks terrible and is nearly always fine underneath. Moss sits on the surface, holds water, and shoves tiles about a bit in a hard frost. Clearing it, refitting the odd tile and sorting the ridge is a day's work. Nobody should be quoting a re-roof for moss.

Ridge Mortar Gone, One Bad Flashing: Repairable

Loose ridge tiles and a split lead flashing at the chimney are the two most common reasons a roof gets condemned by a roofer who wants a bigger job. Both are repairs. Re-bedding or dry-fixing a ridge and re-dressing a flashing costs a few hundred pounds, not several thousand.

500+
Roofs Worked On
Free
Roof Inspection
Same Day
Emergency Call-Outs
10 Year
Workmanship Guarantee

How A Re-Roof Goes From Verdict To Handover

A new roof is the biggest single bill most homeowners ever pay for a repair, so the process has to be clear from the first visit.

1

Inspection And An Honest Answer

We go on the roof and into the loft, check the fixings, the felt, the timber and the covering, and tell you one of three things: it is a repair, it is a part re-roof, or it genuinely needs the lot. Photos of the evidence come with the verdict.

2

Specification And Written Quote

If it is a re-roof, the quote lists the material options with prices for each, the batten grade, the membrane, the fixings, the ridge and verge system, the scaffold, skips and Building Control fee. Nothing is bundled into a single number you cannot question.

3

Notification And Scaffold

Replacing a roof is notifiable building work, so Building Control at the council are told before we start. The scaffold goes up with edge protection and a lift at the eaves, which is the only safe and legal way to strip a two-storey roof.

4

Strip And Check The Timber

Old covering, battens and felt come off and into the skip. Every rafter is looked at, the eaves and wall plate especially. Rot is cut out and spliced, and anything that needs strengthening is sorted while it is exposed. This is the stage where surprises turn up, and where we show you them.

5

Membrane, Battens And Covering

Breathable membrane goes on with proper laps, then new treated battens set to the gauge the tile or slate needs. The covering is laid and fixed to the current standard, with every slate nailed or hooked and tiles clipped where the exposure calls for it, which on a coastal site means nearly everywhere.

6

Ridges, Verges, Flashings And Handover

Dry ridge and dry verge systems are fitted so nothing relies on mortar that will crack in five winters. Lead at chimneys and abutments is renewed and dressed. We walk the finished roof with you, hand over the written guarantee and the Building Control completion paperwork, and the scaffold comes down.

Only When It Needs Doing, And Then Done Right

Every roof we replace comes with a written workmanship guarantee, ten years in writing, covering the stripping, the timber work, the battening, the membrane and the laying of the covering. If something we fitted fails, you ring us and we put it right. That is the same promise we make on a two-hour repair, applied to the biggest job we do.

The promise that matters more on this page is the one about not replacing roofs that do not need it. We make our living from repairs, and a re-roof we talk someone out of is a customer who rings us for the next twenty years. If you have been quoted a full roof by someone else, have us look before you sign. More often than not we will find a repair, and if we do not, you will know the re-roof was the right call.

10 Year GuaranteeTen years on workmanship, on every repair, in writing.
Free Inspection FirstWe get on the roof and find the cause before we price anything.
Fully InsuredPublic liability cover on every job. Ask and we will show you the certificate.

What To Check Before You Sign For A New Roof

Did They Ever Say No?

Ask the roofer when they last told a customer a re-roof was unnecessary. If the answer is a blank look, be careful. A roofer who inspects properly turns down more new roofs than they take on, because most roofs in Newcastle are repairable. One who finds a reason to strip every roof they stand on is pricing their mortgage, not your house.

Is The Spec In Writing, Line By Line?

A good re-roof quote reads like a shopping list: the covering named by product, batten size and grade, membrane by name, type of ridge and verge system, number and type of fixings, what happens to the lead. A quote that just says 're-roof in slate, £9,000' leaves every one of those decisions to be made on the day by whoever wants the cheapest option.

Scaffold And Building Control Included?

Both are legal requirements on a re-roof and both cost money. A quote that leaves them out looks cheaper by a thousand pounds or more and is not comparable with one that includes them. Ask directly who is notifying Building Control, who is paying the fee, and whether the scaffold has edge protection. If the answer to any of those is a shrug, keep looking.

Fix The Faults, Do Part Of It, Or Strip The Lot?

Three honest routes for a roof that is showing its age, and when each one is the right spend on a typical Newcastle semi or terrace.

Repair the faultsOverlay or part re-roofFull strip and re-roof
What is doneSlipped tiles refitted, ridge re-bedded, flashings renewed, eaves felt replaced where tornOne slope, or the worst section, stripped and re-covered; or a new covering over a sound existing deck on a flat roofEverything off to the rafters, timber checked, new membrane, battens, covering, ridge, verge and lead
Guide price£150 - £1,500£2,500 - £6,000£5,500 - £14,000
Time on siteHours to a dayTwo to three daysTwo to five days on a semi, longer on a large detached
Scaffold and Building ControlLadder or tower, no notificationScaffold usually, notification if more than half the roof is renewedScaffold, notification and completion certificate
What you getA sound roof with its remaining life, often decadesA new slope on an old roof; the other side will want doing laterA roof that is new from the timber up, with the insulation brought up to standard
Right choice whenThe faults are local and the fixings and felt are mostly soundOne elevation takes all the weather and the other is fineNail sickness, perished felt or delaminating tiles across the whole roof

A Semi In Newcastle, Stripped And Ready For Tiles

The house in the photo is a 1930s semi in Newcastle at the halfway point of a re-roof. The old concrete tiles were delaminating across both slopes, the felt tore when you looked at it, and the bay roof below the bedroom window had been patched three times. In the picture the stripping is done, the membrane and new battens are on the main roof and the bay, the chimney has been checked and re-flaunched while the scaffold is there, and the new tiles are stacked ready to go on. Two days in, two to go.

The decision to strip it was made in the loft, not from the drive. Had the felt been sound and the tiles only mossy, we would have been doing a tile repair and sending the owner a far smaller invoice. The ridge came off with the tiles and went back on as a dry ridge system, which is the standard we use on every re-roof now rather than the mortar bedding that was coming loose on the old one. If a ridge is the only problem on an otherwise sound roof, that is a ridge and hip job on its own, not a reason to re-roof.

You get photos at every stage: the old roof, the stripped timber, the membrane and battens, and the finished covering. It is your money and your house, and you should be able to see what it bought.

Semi-detached house in Newcastle mid re-roof with new battens fixed over membrane on the main roof and bay, a ladder up to the slope and the chimney stack behind

Based on the inspections we carry out across Newcastle, roughly three in every four roofs we are asked to quote for replacing turn out to need a repair instead, and we quote the repair.

Based on the enquiries and jobs handled by Huckleberry Roofing Ltd. A rough picture of what we see, not a formal survey.

What A New Roof Costs In Newcastle

A concrete interlocking tile re-roof on a standard semi sits at the lower end. Fibre cement slate is a step up, natural slate another, and a large detached or a terrace with a long slope and several chimneys reaches the top. Scaffold, skips, Building Control and VAT are in the figure, in writing, before we start.

£5,500 - £14,000

See The Full Cost Guide

Roof Replacement Questions From Newcastle Homeowners

How long does a roof replacement take?

Two to five days on a typical Newcastle semi, depending on the covering and the weather. Scaffold goes up the day before. Stripping and timber checks take the first day, membrane and battens the second, and the covering, ridges and lead the rest. A large detached or a slate roof with a lot of cutting takes longer. We do not strip more than we can cover and make watertight the same day, so you are never left open overnight.

Natural slate, fibre cement or concrete tile: which should I choose?

Natural slate is the longest lasting by a distance and the right choice on a Jesmond or Heaton terrace that already has it. Fibre cement slate looks similar from the street, is lighter and cheaper, and lasts a good few decades. Concrete interlocking tiles are the cheapest and quickest to lay and suit the post-war estates they were designed for. Clay pantiles are the traditional covering along the coast and on older cottages. We price whichever of those suit the house and tell you what we would do if it were ours.

Will I have to add insulation when the roof is replaced?

Usually, yes. Replacing the covering on more than half of a roof counts as renovating a thermal element under Part L of the Building Regulations, which means the insulation should be brought up to the current standard as part of the work where that is practical and the cost is reasonable. On most Newcastle houses that means topping up the loft insulation at ceiling level, which is cheap and easy while we are there. Insulating at rafter level is for rooms in the roof and costs more. Either way we tell you before the quote is signed, not after.

Does Building Control need to know about a re-roof?

Yes. A roof replacement is notifiable building work, and Building Control at the council need to be told before it starts, through a building notice or a competent person scheme. They are interested in the insulation, the weight of the new covering on the existing timber, and the fixings. A completion certificate at the end is something you will want when you come to sell. If a roofer says notification is not needed for a full re-roof, that is wrong.

Can you re-roof one side of my house and leave the other?

Yes, and it is sometimes the sensible answer. A north-east facing slope on a house in Whitley Bay or North Shields takes the salt and the driving rain and can be finished long before the sheltered slope behind it. We strip and re-cover the bad side, tie the new covering into the old at the ridge, and leave the good side alone until it needs doing. The quote will say plainly that the other slope is not included and roughly when to expect it.

Do I need planning permission to replace my roof in Newcastle?

Not for a like-for-like re-roof on an ordinary house. Newcastle City Council treats replacing a roof covering in the same or similar material as a repair, and no planning application is needed. In conservation areas such as Jesmond, Gosforth and Grainger Town the material matters: swapping Welsh slate for concrete tiles on a street of slate roofs can need consent, and we check with the council's conservation team before quoting a change of material there. Listed buildings need consent for almost any change, including the covering.
Newly slated hipped garage roof in Newcastle with a ridge fitted, timber battens leaning against it and a corrugated outbuilding behind

Roof Replacement Across Tyne And Wear

Newcastle upon Tyne is home turf, and we cover the rest of Tyne and Wear from there. Pick your area for the local page, or just ring if you are somewhere in between.

Had A Big Quote? Get A Second Look First.

Free inspection, including the loft. If it is a repair we will quote the repair. If it genuinely needs replacing you will get a line-by-line written quote with every material option priced.